E-max 110 S Instrukcja Operatora Strona 29

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 38
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 28
29
Date, Signature, Stamp
“e-max“ Dealer
5. Shipment Inspection
The following inspection work was carried out before delivery of the vehicle:
charge batteries (note battery guidelines) and check contacts
check tyre pressure and correct if necessary
check all main screws for the stipulated torque
check screws, nuts and fastening elements
check motor mountings, stand mountings, suspension struts, fork and steering-head
bearing
check the functioning of the front and rear wheel suspension
check that all operating elements are in working order
check lights / headlight setting
check directional stability, front and rear brakes
and handling
Przeglądanie stron 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 37 38

Komentarze do niniejszej Instrukcji

Brak uwag